Project Description
The Town of Oliver required additional storage to continue to provide proper demand balancing and emergency storage. The existing concrete reservoir was determined to be in satisfactory condition. It was decided to construct a new reservoir adjacent to the existing as well as a new valve chamber in order to operate the tanks either individually or together. The constructed site was highly contained with steep slopes, poor access and shallow bedrock.
The project scope included the following:
- 2500m3 cast in place reservoir
- Cast in place valve chamber
- 350Ø supply piping
- 300Ø outlet piping
- Overflow piping
- Electrical
- 3000m3 rock blasting
Project Services
Services Provided
- Hydraulic Modelling
- Conceptual Design
- Preliminary Design
- Detailed Design
- Procurement Services
- Contract Administration
- Construction Inspection
- Project Management
- Regulatory Approvals