Project Description
The replacement of the Main Lift station at Kingfisher Avenue and 89th Street is required to maintain suitable levels of sanitary sewer collection service to the Town for at least the next 40 years. The general project scope included the following:
- 2 – FRP Lift Stations
- 4 – 25hp sewage pumps
- 4 – 125hp vertical turbine pumps
- 2 – Rotating Drums Screens c/w Wash Compactors
- 3,500 cfm Odour Treatment System
- Electrical
- 35m³ Working Volume Cast-in-Place Clearwell
- 350m² paved parking area
- 175m² Concrete walkway and driveway
- 260m² Precast Concrete Building with cast-in-place foundation
Project Services
Services Provided
- Hydraulic Modelling
- Conceptual Design
- Preliminary Design
- Detailed Design
- Procurement Services
- Contract Administration
- Construction Inspection
- Project Management
- Regulatory Approvals