Juniper Detention Pond

Client
Juniper West Developments
Year of Completion
2016
Service Category
Stormwater

Project Description

As part of providing engineering services to aid in the surrounding development, TRUE was tasked with preparing a stormwater management plan acceptable to the City of Kamloops. The stormwater management plan recommended restricting post-development flows to pre-development rates. The stormwater management plan also recommended a detention pond to achieve the post-development flowrate restriction. Design of the detention pond comprised of the following:

  • 1,500m3 detention pond
  • Overflow mechanism
  • Erosion protection (riprap and check dams) for downstream receiving gully
  • Inlet and outlet piping

Project Services

Services Provided

  • Hydraulic Modelling
  • Conceptual Design
  • Preliminary Design
  • Detailed Design
  • Contract Administration
  • Construction Inspection
  • Project Management
  • Municipal Approvals