Project Description
This project was triggered by aging and damaged stormwater infrastructure in the highway. The Town of Osoyoos and TRUE took this opportunity to improve pedestrian and vehicle safety along this critical corridor of Highway 3. This project included:
- 725 m of storm sewer
- 12 manholes
- 26 catch basins
- 4500 m² of asphalt restoration
- Traffic calming bump-outs
Project Services
Services Provided
- Conceptual Design
- Preliminary Design
- Detailed Design
- Procurement Services
- Contract Administration
- Construction Inspection
- Project Management