TRUE Kamloops

#201-2079 Falcon Road
Kamloops, B.C.  V2C 4J2
Telephone:  (250) 828-0881
Facsimile:  (250) 828-0717
Email: info@true.bc.ca

 

TRUE Kelowna - New Address!

#203-570 Raymer Avenue
Kelowna, B.C.  V1Y 4Z5
Telephone:  (250) 861-8783
Facsimile:  (250) 861-8773
Email: info@true.bc.ca

TRUE Williams Lake

#106-197 Second Avenue North
Williams Lake, B.C.  V2G 1Z5
Telephone:  (250) 305-6605
Facsimile:  (250) 305-6615
Email: info@true.bc.ca

TRUE Trail

#2-860 Eldorado Street
Trail, B.C.  V1R 3V4
Telephone:  (250) 368-8707
Facsimile:  (250) 368-8708
Email: info@true.bc.ca

Quick Contact

Pressure Reducing Sation PRV #24 Upgrades

Client: Regional District of North Okanagan

Date: October 2014

Value: $350,000

 

TRUE Consulting provided Civil Engineering services for a pressure reducing station upgrade for the Regional District of North Okanagan.  TRUE Consulting completed planning, detailed design, construction management, agency approval applications, and was the coordinating professional responsible for the electrical and structural subconsultants.

Pressure reducing valve #24 is located near the northwest corner of Highway No. 6 and Aberdeen Road in Coldstream, BC. The original station was constructed in the late 1960’s. This station comprised of 100mm and 300mm PRVs in a cast in place reinforced concrete below grade vault structure. When initially constructed, cover over the vault was about 0.6m deep. Highway improvements undertaken around 1980 resulted in an additional 2m of cover being placed over the PRV vault.

TRUE designed the #24 PRV replacement station with an above ground building structure, providing non-confined space access and safer working conditions for operation staff. TRUE designed the new station with pressure reducing valves with capacity for future growth and increased water demand.

TRUE designed the new PRV #24 to provide water to three additional pressure zones that were not previously connected.  TRUE’s design incorporated instrumentation for monitoring flow, pressures and residual chlorine through the District of Coldstream’s SCADA system.

The design of the mechanical system within the station was comprised of stainless steel process piping, 150mm and 250mm pressure reducing valves, 250mm flowmeter and residual chlorine analyzing equipment.

Completed Projects

Prev Next

483 Water Reservoir

Client: Keremeos Irrigation District Date: July 2014 Value: $1,335,000

100 Mile House Pressure Reducing Station Replacement

Client: District of 100 Mile House Date: September 2015 Value: $170,000

Sahali Secondary Sanitary Sewer Upgrades

Client: School District No. 73 Date: 2015 Value: $77,000

Raft River Elementary School Site Improvements

Client: School District No. 73 Date: 2015 Value: $189,000

Marion Schilling Elementary School Site Improvements

Client: School District No. 73 Date: 2015 Value: $178,000

Skaha Hills 520 Reservoir

Client: Penticton Indian Band Date: December 2014 Value: $950,000

Reclaimed Water Irrigation System Booster Station

Client: Town of Osoyoos Date: September 2014 Value: $455,000

340 Reservoir Twinning

Client: Town of Osoyoos Date: September 2012 Value: $960,000

381 Reservoir Twinning

Client: Town of Oliver Date: March 2010 Value: $1,200,000

Solsqua Bridge Water and Sewer Main Replacement

Client: District of Sicamous Date: September 2014 Value: $185,000

System No. 2 Chlorination Upgrade - Contact Main

Client: Town of Oliver Date: September 2014 Value: $241,000

Reclaimed Water Upgrade & Effluent Infiltration Basin

Client: Town of Oliver Date: January 2014 Value: $230,000

Pressure Reducing Station PRV#24 Upgrades

Client: RDNO Date: October 2014 Value: $350,000

Gore Street - Water Servicing Improvements

Client: City of Nelson Date: 2014 Value: $800,000

Ponderosa Ave PRV Station Replacement

Client: District of Logan Lake Date: October 2013 Value: $220,000

Water Supply Main - Emergency Reconstruction

Client: Village of Montrose Date: May 2012 Value: $300,000

Water Supply Upgrades - High Lift Pumpstation

Client: Village of Montrose Date: May 2013 Value: $1,300,000

Water Treatment Facility Phase 1

Client: District of Lillooet Date: September 2013 Value: $2,600,000

Seton River Intake

Client: District of Lillooet Date: June 2014 Value: $1,300,000

Wildwood Sanitary Sewer Lift Station Improvements

Client: Cariboo Regional District Date: Fall 2013/Spring 2014 Value: $130,000

Integrated Stormwater Management Plan

Client: District of Lillooet Date: March 2009

Water System Extension and Municipal Bou…

Client: Town of Princeton Date: Fall 2009 Value: $2,600,000

Windermere Water Treatment Plant

Client: Parr Utilities Ltd. Date: August 2009 Value: $4,000,000

Reclaimed Water Chlorine Contact Basin

Client: Town of Oliver Date: March 2010 Value: $190,000

Mt. Baldy Resort Expansion

Client: Mt. Baldy Ski Resort Date: 2004 - Present Value: $50,000,000

Bayview Booster Station

Client: District of Sicamous Date: September 2010 Value: $493,000

Windermere Lake Intake Upgrading

Client: Parr Utilities Ltd. Date: June 2011 Value: $570,000

Alexis Creek Water System Upgrades

Client: Cariboo Regional District Date: July 2009 Value: $1,200,000

74th Avenue Water Supply Main and Hwy 97…

Client: Town of Osoyoos Date: June 2008 Value: $700,000

Two-Mile Area Water Extensions

Client: District of Sicamous Date: November 2010 Value: $925,000