TRUE Kamloops

#201-2079 Falcon Road
Kamloops, B.C.  V2C 4J2
Telephone:  (250) 828-0881
Facsimile:  (250) 828-0717
Email: info@true.bc.ca

 

TRUE Kelowna - New Address!

#203-570 Raymer Avenue
Kelowna, B.C.  V1Y 4Z5
Telephone:  (250) 861-8783
Facsimile:  (250) 861-8773
Email: info@true.bc.ca

TRUE Williams Lake

#106-197 Second Avenue North
Williams Lake, B.C.  V2G 1Z5
Telephone:  (250) 305-6605
Facsimile:  (250) 305-6615
Email: info@true.bc.ca

TRUE Trail

#2-860 Eldorado Street
Trail, B.C.  V1R 3V4
Telephone:  (250) 368-8707
Facsimile:  (250) 368-8708
Email: info@true.bc.ca

Quick Contact

340 Reservoir Twinning

Client: Town of Osoyoos

Date: September 2012

Value: $960,000

 

The Town of Osoyoos utilizes several reservoirs for balancing and emergency water storage. These reservoirs supply various pressure zones within the water supply network. A review of the system showed that the existing 340 reservoir was undersized and required an upgrade. Constructed in 1964, the reservoir was considered to be in good condition.

The decision was made to construct additional storage by means of a twinning reservoir, located at the same location and elevation as the existing concrete tank. The proposed reservoir was sized to account for the existing deficiencies in storage capacity as well as the projected requirements. Pipe and valve works to supply and drain the new reservoir were sized to allow for simultaneous operation of the two reservoirs, resulting in water levels between the tanks being equivalent.

Construction of the twinning reservoir required substantial earthworks, including removal of bedrock by means of blasting.

The reservoir twinning project included:

  • 2,550m³ cast-in-place reservoir
  • Cast-in-place valve chamber, with precast block retaining wall
  • 350ø and 400ø pipes and valve work to supply and drain the proposed reservoir
  • Construction of an overflow detention pond
  • Upgrade of controls to incorporate the new reservoir into the distribution system

TRUE Consulting provided detailed design, construction management, agency approval applications, and was the coordinating professional responsible for the electrical and structural subconsultants.

Completed Projects

Prev Next

483 Water Reservoir

Client: Keremeos Irrigation District Date: July 2014 Value: $1,335,000

100 Mile House Pressure Reducing Station Replacement

Client: District of 100 Mile House Date: September 2015 Value: $170,000

Sahali Secondary Sanitary Sewer Upgrades

Client: School District No. 73 Date: 2015 Value: $77,000

Raft River Elementary School Site Improvements

Client: School District No. 73 Date: 2015 Value: $189,000

Marion Schilling Elementary School Site Improvements

Client: School District No. 73 Date: 2015 Value: $178,000

Skaha Hills 520 Reservoir

Client: Penticton Indian Band Date: December 2014 Value: $950,000

Reclaimed Water Irrigation System Booster Station

Client: Town of Osoyoos Date: September 2014 Value: $455,000

340 Reservoir Twinning

Client: Town of Osoyoos Date: September 2012 Value: $960,000

381 Reservoir Twinning

Client: Town of Oliver Date: March 2010 Value: $1,200,000

Solsqua Bridge Water and Sewer Main Replacement

Client: District of Sicamous Date: September 2014 Value: $185,000

System No. 2 Chlorination Upgrade - Contact Main

Client: Town of Oliver Date: September 2014 Value: $241,000

Reclaimed Water Upgrade & Effluent Infiltration Basin

Client: Town of Oliver Date: January 2014 Value: $230,000

Pressure Reducing Station PRV#24 Upgrades

Client: RDNO Date: October 2014 Value: $350,000

Gore Street - Water Servicing Improvements

Client: City of Nelson Date: 2014 Value: $800,000

Ponderosa Ave PRV Station Replacement

Client: District of Logan Lake Date: October 2013 Value: $220,000

Water Supply Main - Emergency Reconstruction

Client: Village of Montrose Date: May 2012 Value: $300,000

Water Supply Upgrades - High Lift Pumpstation

Client: Village of Montrose Date: May 2013 Value: $1,300,000

Water Treatment Facility Phase 1

Client: District of Lillooet Date: September 2013 Value: $2,600,000

Seton River Intake

Client: District of Lillooet Date: June 2014 Value: $1,300,000

Wildwood Sanitary Sewer Lift Station Improvements

Client: Cariboo Regional District Date: Fall 2013/Spring 2014 Value: $130,000

Integrated Stormwater Management Plan

Client: District of Lillooet Date: March 2009

Water System Extension and Municipal Bou…

Client: Town of Princeton Date: Fall 2009 Value: $2,600,000

Windermere Water Treatment Plant

Client: Parr Utilities Ltd. Date: August 2009 Value: $4,000,000

Reclaimed Water Chlorine Contact Basin

Client: Town of Oliver Date: March 2010 Value: $190,000

Mt. Baldy Resort Expansion

Client: Mt. Baldy Ski Resort Date: 2004 - Present Value: $50,000,000

Bayview Booster Station

Client: District of Sicamous Date: September 2010 Value: $493,000

Windermere Lake Intake Upgrading

Client: Parr Utilities Ltd. Date: June 2011 Value: $570,000

Alexis Creek Water System Upgrades

Client: Cariboo Regional District Date: July 2009 Value: $1,200,000

74th Avenue Water Supply Main and Hwy 97…

Client: Town of Osoyoos Date: June 2008 Value: $700,000

Two-Mile Area Water Extensions

Client: District of Sicamous Date: November 2010 Value: $925,000