TRUE Kamloops

#201-2079 Falcon Road
Kamloops, B.C.  V2C 4J2
Telephone:  (250) 828-0881
Facsimile:  (250) 828-0717
Email: info@true.bc.ca

 

TRUE Kelowna - New Address!

#203-570 Raymer Avenue
Kelowna, B.C.  V1Y 4Z5
Telephone:  (250) 861-8783
Facsimile:  (250) 861-8773
Email: info@true.bc.ca

TRUE Williams Lake

#106-197 Second Avenue North
Williams Lake, B.C.  V2G 1Z5
Telephone:  (250) 305-6605
Facsimile:  (250) 305-6615
Email: info@true.bc.ca

TRUE Trail

#2-860 Eldorado Street
Trail, B.C.  V1R 3V4
Telephone:  (250) 368-8707
Facsimile:  (250) 368-8708
Email: info@true.bc.ca

Quick Contact

Alexis Creek Water System Upgrades

 

Client: Cariboo Regional District

Date: July 2009

Value: $1,200,000

 

 

In 2006 the Cariboo Regional District (CRD) applied for a grant under the Canada-BC Municipal Rural Infrastructure Fund program in order to develop a water system for the central Alexis Creek area. The grant application was made on the basis of developing a safe and healthy water system for the small rural community in order to address ongoing water quality concerns with respect to some of the existing stand-alone water systems (six in total varying in age and condition).

It was imperative to the Cariboo Regional District and the community of Alexis Creek that the improved water system design maintained reliable potable water and fire protection capabilities to the entire community.

The main challenge associated with this project was replacing six independent water systems with a new system capable of providing sufficient water storage for both domestic consumption and fire suppression storage while maintaining adequate residual pressures to services to the entire community.

To accomplish this, a bolted steel reservoir was proposed and later installed at an appropriate elevation for provision of service by gravity to the community while providing adequate fire flow protection. In general, the distribution system comprised the following:

  • 2.5 km of 150mm (6") diameter PVC watermain
  • 1.0 km of 200mm (8") diameter PVC watermain
  • 50 service connections (includes residential and commercial buildings)
  • 3 pressure reducing valve stations

Due to topographical constraints three pressure reducing valve stations were installed in strategic locations to reduce domestic pressures to an acceptable range. Adequate pipe sizing were determined to ensure adequate fire flow potential was available throughout the community.

This project was very beneficial to the community occupying Central Alexis Creek. The existing six independent water systems were unreliable and unsafe in terms of water quality and have since been replaced by one supply system capable of providing safe reliable drinking water. In addition, the community now has adequate fire suppression capabilities in the event of a fire.

Completed Projects

Prev Next

483 Water Reservoir

Client: Keremeos Irrigation District Date: July 2014 Value: $1,335,000

100 Mile House Pressure Reducing Station Replacement

Client: District of 100 Mile House Date: September 2015 Value: $170,000

Sahali Secondary Sanitary Sewer Upgrades

Client: School District No. 73 Date: 2015 Value: $77,000

Raft River Elementary School Site Improvements

Client: School District No. 73 Date: 2015 Value: $189,000

Marion Schilling Elementary School Site Improvements

Client: School District No. 73 Date: 2015 Value: $178,000

Skaha Hills 520 Reservoir

Client: Penticton Indian Band Date: December 2014 Value: $950,000

Reclaimed Water Irrigation System Booster Station

Client: Town of Osoyoos Date: September 2014 Value: $455,000

340 Reservoir Twinning

Client: Town of Osoyoos Date: September 2012 Value: $960,000

381 Reservoir Twinning

Client: Town of Oliver Date: March 2010 Value: $1,200,000

Solsqua Bridge Water and Sewer Main Replacement

Client: District of Sicamous Date: September 2014 Value: $185,000

System No. 2 Chlorination Upgrade - Contact Main

Client: Town of Oliver Date: September 2014 Value: $241,000

Reclaimed Water Upgrade & Effluent Infiltration Basin

Client: Town of Oliver Date: January 2014 Value: $230,000

Pressure Reducing Station PRV#24 Upgrades

Client: RDNO Date: October 2014 Value: $350,000

Gore Street - Water Servicing Improvements

Client: City of Nelson Date: 2014 Value: $800,000

Ponderosa Ave PRV Station Replacement

Client: District of Logan Lake Date: October 2013 Value: $220,000

Water Supply Main - Emergency Reconstruction

Client: Village of Montrose Date: May 2012 Value: $300,000

Water Supply Upgrades - High Lift Pumpstation

Client: Village of Montrose Date: May 2013 Value: $1,300,000

Water Treatment Facility Phase 1

Client: District of Lillooet Date: September 2013 Value: $2,600,000

Seton River Intake

Client: District of Lillooet Date: June 2014 Value: $1,300,000

Wildwood Sanitary Sewer Lift Station Improvements

Client: Cariboo Regional District Date: Fall 2013/Spring 2014 Value: $130,000

Integrated Stormwater Management Plan

Client: District of Lillooet Date: March 2009

Water System Extension and Municipal Bou…

Client: Town of Princeton Date: Fall 2009 Value: $2,600,000

Windermere Water Treatment Plant

Client: Parr Utilities Ltd. Date: August 2009 Value: $4,000,000

Reclaimed Water Chlorine Contact Basin

Client: Town of Oliver Date: March 2010 Value: $190,000

Mt. Baldy Resort Expansion

Client: Mt. Baldy Ski Resort Date: 2004 - Present Value: $50,000,000

Bayview Booster Station

Client: District of Sicamous Date: September 2010 Value: $493,000

Windermere Lake Intake Upgrading

Client: Parr Utilities Ltd. Date: June 2011 Value: $570,000

Alexis Creek Water System Upgrades

Client: Cariboo Regional District Date: July 2009 Value: $1,200,000

74th Avenue Water Supply Main and Hwy 97…

Client: Town of Osoyoos Date: June 2008 Value: $700,000

Two-Mile Area Water Extensions

Client: District of Sicamous Date: November 2010 Value: $925,000